Sheep camp rehabilitation – Friends of Mount Majura
May 262008
 

When: Sunday, 15 June 2008, from 1.00pm to 3.00pm
Where: Former sheep camp, Mt Majura ridge, where the Casuarina trail hits the Summit trail.
Bring & Wear: Sun protection, sturdy boots, a bucket or watering can, a mattock, if you have one, and your best smile
What: Planting of native tree and shrub seedlings

Revegetation at former sheep camp April 2008 (photo: W. Pix)

We will plant Yellow box, Bundy, Scribbly gums, Silver wattle and Cassinia. You will be rewarded with splendid views, a pleasant winter afternoon, fun and social company, and the satisfaction of having contributed to the enhancement of the bushland on your doorstep.
Enquiries: ph 6247 7515 or e-mail admin@majura.org

Download this poster for distribution

Dec 222007
 

Before Stage 1.Dec 2004

Before Stage 1.Dec 2004

Before Stage 1.Feb 2005

Before Stage 1.May 2005

Before Stage 2.Aug 2005

Before Stage 2.Aug 2005

Cunningham’s Skink

Bearded Dragon (juvenile)

Brushtail Speargrass flowering

New Holland Daisy flowers and seeds

Red Anthered Wallaby Grass flower

Sticky everlasting visited by Common Brown butterfly

Recovery, Stage 1Mar 2005

Recovery, Stage 1Mar 2005

Recovery, Stage 1Nov 2006New Holland daisy

Recovery, Stage 1Nov 2006

Weeds: horehound seeding

Weeds: saffron thistle

Weeds: serrated tussock

Weeding working bee

Bag on foot

Piling up the bags

Waiting to be collected

Trucked away

Enjoying a break

Collecting daisy seeds

Ceremonial seeding at World Environment Day 2005 celebration

Eucalyptus seedlings ready for planting

Planting working bee

Planting a tree

Apple box seedling

Watering a seedling

Dec 222007
 

The Rehabilitation of a Former Sheep Camp on Mount Majura

First step. Friends of Mt Majura (FoMM) began work at the old sheep camp in 2003. The approximately 4.5 ha area was monitored and subdivided to proceed in three stages. An inventory of introduced and indigenous plants of the site was compiled that lists the weeds for removal and the native plants for direct seeding and planting.

In December 2003, two small 2×3 meter trial plots along the trail were hand-weeded and seeded with Speargrasses and New Holland Daisies and monitored over time. Collection of native seeds from nearby sites began in the summer of 2003 / 2004 and continued over the following years.

Weeding. In October 2004 large-scale removal of horehound, thistles and Indian Hedge Mustard began at Stage 1 to the west of the Casuarina trail and at the top part. We had several weeding parties at Stage 2 in July 2005 and started follow-up weeding at Stage 1 sites from spring 2005 onwards. In summer 2006 saffron thistles had been removed from a large area at Stage 2 before the plants could release their seeds.

We moved on to Stage 3 in winter 2006, tackling horehound in the vicinity of FoMM’s information display, down-slope near the pine plantation and up-slope along the summit trail. As usual, we hand-pulled the weeds, placed them in bags, which we carried to a pick-up point. The weeds were collected by FoMM members and by rangers of Parks, Conservation and Lands and delivered to Canberra Sand and Gravel where they are turning into fine compost. By now an estimated thirty truckloads of weeds have been removed from the site.

After each weeding session, we broadcast seeds of indigenous grasses and forbs on the sites disturbed by the weeding activity. Direct seeding of mat rushes, hopbush and wattles started in early spring 2005 at Stage 1 and 2 sites.

Tree planting. During winter 2006 we raised seedlings from locally collected eucalyptus seeds. End of August 2006 we planted the seedlings at the cleared areas of the sheep camp. The planting sites were carefully chosen and prepared complete with miniature catchments. The young plants did very well and started to grow new shoots despite several frosts in September. A campaign addressed to walkers and runners to share water with the seedlings was just taking off when in early October in a senseless act of vandalism the seedlings were uprooted.

What next. We will raise a second batch of tree seedlings, which will be ready for planting in winter 2007. If vandalism continues we will trial direct seeding of trees. We plan to collect more seeds of groundcover plants and to conduct follow-up weeding at Stage 2 sites during the cooler months in autumn.

Waltraud Pix
Friends of Mt Majura co-ordinator
October 2006